Construction Hoarding Signs
Own the perimeter with hoarding signs.
Request a QuoteOwn the perimeter with hoarding signs.
Our construction hoarding signs are engineered for downtown job sites, with weatherproof, vandal-resistant panels designed for fast installation around any footprint.
Who it's for
Developers, GCs, and project teams who need professional hoarding signs for mid-rise to high-rise builds.
Why Hoarding Kings
- Weatherproof sign substrates — aluminum & coroplast
- Sign permits and city approvals handled in-house
- Rapid GTA-wide sign install crews
Construction hoarding that sells the project before it is built
A construction site's hoarding is the largest piece of advertising most developments will ever own. It runs 24 hours a day, faces thousands of drivers and pedestrians, and stays up for the life of the build. Hoarding Kings designs, permits, prints and installs construction hoarding signs for developers and general contractors across Toronto and the GTA, turning a plain perimeter into a branded, on-message billboard for your project.
Built for Toronto job sites
Every hoarding project starts with the site: perimeter length, sidewalk and road exposure, existing fencing or hoarding walls, and how long the panels need to last. If your site needs a hoarding wall, we build that too, so one team delivers the structure, the graphics and the install.
We match the material to the job: aluminum composite (ACM) for long-term, high-end launches, coroplast for shorter phases and budget-sensitive sites, and mesh or vinyl where wind load or fence type calls for it. Panels are printed in-house on our wide format UV printer at up to 10 ft seamless, colour-managed against your brand standards so renderings, logos and sales messaging look exactly as approved.
Permits handled for you
Signs on hoarding often need municipal approval. Our team prepares the drawings and manages the submission so your install date isn't held up by paperwork. We handle sign permits for projects in Toronto and across Canada.
Installed by certified crews
Our install crews are working-at-heights certified, fully insured and WSIB compliant. We schedule around your site activity, install clean and square, and come back for phase changes, sales updates or damage repairs when you need us.
Typical hoarding projects
- Pre-sale and launch hoarding for condo and townhome developments
- Branded perimeter signage for active construction sites
- Renovation and storefront concealment during fit-outs
- Phase updates, "now selling" and occupancy messaging
Recent work: LSQ Condo, 2305 Sheppard Ave E, North York. 420 ft of branded hoarding, permitted, printed and installed in 9 days.
Construction Hoarding Signs questions
How long does a hoarding project take?
It depends on the size of the perimeter and whether a permit is required. Production-only work moves quickly; permitted installations follow the municipality's review timeline. Every quote includes a confirmed schedule.
What material is best for hoarding signs?
ACM for premium, long-term launches; coroplast for shorter phases; mesh where wind is a concern. We'll recommend the right option for your site and budget.
Do you build the hoarding wall as well as the signs?
Yes. If your site needs one, we build the hoarding wall and supply, print and install the sign panels, all as one project.
Do I need a permit for signs on hoarding?
Often, yes. Requirements vary by municipality. We check what's needed for your site and manage the application for you.
Can you update the hoarding as the project progresses?
Yes. We print and install replacement panels for new phases, sales milestones or damage.
How quickly can I get a quote?
Send us your site address, perimeter length and deadline. Most quotes go out within 48 hours.
Secure your perimeter.
Quotes returned in 48 hours. Tell us scope, location and deadline — we'll handle the rest.